“ THINK SAFETY BEFORE YOU POUR”

Hard Hat

Safety glasses

Safety Vest

Suitable foot ware

No.: Pre-Pour Checklist 01
Effective Date: 01-15-05 Page: 1 of 1


Check with job superintendent
BEFORE set-up.

Always be professional.
Look up and live.


Subject: Jobsite Pre-Pour Checklist For Salesman or Supervisor


JOBSITE___________________________________ DATE ______________________________________

OPERATOR__________________________________SIZE ________ UNIT # ______________________

Pre-Pour Checklist for Pumping Operations

Who is the person in charge? (PIC) ______________________________
Are there power lines to consider? Can we maintain 17’ clearance?

Is there a staging area for ready-mix trucks?
Are there adequate access and egress routes for trucks?

Do we need traffic control? – contact ready-mix company.
Is there a stable, level area for the pump truck to set up on? Need dunnage?

Is the ground stable enough to support the trucks?
Is there a clean out area available? Washout bag needed?

Is there adequate lighting for the pump truck and ready-mix truck?
Have weather conditions been considered?

Hose Size ________ “ length ___________ ‘ [don’t overload boom]
Keep all personnel back REASONABLE SAFE DISTANCE from tip during priming, after re-positioning, plugging or after prolonged delays. COMMENTS:_______________________________________________________ ____________________________________________________________________

Written By Bob Sanderson