“ THINK SAFETY BEFORE YOU POUR”
Hard Hat
Safety glasses
Safety Vest
Suitable foot ware
No.: Pre-Pour Checklist 01
Effective Date: 01-15-05 Page: 1 of 1
Check with job superintendent
BEFORE set-up.
Always be professional.
Look up and live.
Subject: Jobsite Pre-Pour Checklist For Salesman or Supervisor
JOBSITE___________________________________ DATE ______________________________________
OPERATOR__________________________________SIZE ________
UNIT # ______________________
Pre-Pour Checklist for Pumping Operations
Who is the person in charge? (PIC) ______________________________
Are there power lines to consider? Can we maintain 17’
clearance?
Is there a staging area for ready-mix trucks?
Are there adequate access and egress routes for trucks?
Do we need traffic control? – contact ready-mix company.
Is there a stable, level area for the pump truck to set
up on? Need dunnage?
Is the ground stable enough to support the trucks?
Is there a clean out area available? Washout bag needed?
Is there adequate lighting for the pump truck and ready-mix
truck?
Have weather conditions been considered?
Hose Size ________ “ length ___________ ‘ [don’t
overload boom]
Keep all personnel back REASONABLE SAFE DISTANCE from tip
during priming, after re-positioning, plugging or after
prolonged delays. COMMENTS:_______________________________________________________
____________________________________________________________________
Written By Bob Sanderson
|